010-59602451
/public/img/company_banner.png
CCC Engineering Ltd
CCC Engineering Ltd., founded in 2000, is fully engaged in power project contracting,design and consulting, survey and supervision, and the export and import of electrical equipment. It can undertake the engineering of the whole industry chain of “generation-transformation-transmission-distribution” and provide new services for the new form of industry “financing-investment-construction-operation-hosting”.its service targets span the globe and cover many countries in southeast Asia,South Asia,Middle East and Africa.



Transmission line,distribution transformers-Lot9(Tanzania)

Transmission line,distribution transformers-Lot9(Tanzania)

132/33KV substation and transmission line (Nepal)

132/33KV substation and transmission line (Nepal)

Medium and Low voltage transmission lines(Tanzania)

Medium and Low voltage transmission lines(Tanzania)

230KV transmission line for Ethiopian-Djibouti(Ethiopian)

230KV transmission line for Ethiopian-Djibouti(Ethiopian)

115KV underground cable system(Cambodia)

115KV underground cable system(Cambodia)

132/33/11KV Substation(Zambia)

132/33/11KV Substation(Zambia)

TARBELA 500/220KV Substation(Pakistan)

TARBELA 500/220KV Substation(Pakistan)

400/132KV Substation for Sugar Factory(Ethiopian)

400/132KV Substation for Sugar Factory(Ethiopian)

Distributed Solar Power Station(Zambia)

Distributed Solar Power Station(Zambia)

Shahjibazar 100 MW Gas Turbine Power Plant Project

Shahjibazar 100 MW Gas Turbine Power Plant Project

News
Bangladesh package-8 EPC project contract officially signed
Bangladesh package-8 EPC project contract officially signed
2026-06-08
On June 4, 2026, the CCCE-ETERN Consortium, a joint venture formed by our company and Jiangsu Yongding, signed a Package-8 general contracting project contract with Power Grid Bangladesh PLC (Power Grid) in Bangladesh. The contract amount is approximately 90 million US dollars, and the scope of the contract includes the construction of one new 230kV GIS substation, the construction of six new 132kV GIS substations, and the expansion of five substations.
Lesotho Butha-Buthe Water Treatment Plant Project
Lesotho Butha-Buthe Water Treatment Plant Project
2026-03-25
CCCE-UNIK JV Successfully Signs Contract for Lesotho Lowlands Water Development Project Phase III – Contract for Design and Build of Intake Works, Raw Water Transmission Line, Water Treatment Works,and High Lifting Pump Station located at Hololo River On March 5, 2026, CCCE-UNIK Joint Venture (JV), formed by CCC engineering Ltd. (CCCE) and Unik Construction Engineering (Pty) Ltd. (UNIK), successfully signed a contract with the Ministry of Natural Resources of the Kingdom of Lesotho for the Leso
the contract for the Kitumba33/11kv substation project in Zambia has been officially signed
the contract for the Kitumba33/11kv substation project in Zambia has been officially signed
2025-10-22
On 26th Sep 2025, Our Company officially signed a contract with Kanona Power Company for the Kitumba 33/11kV Substation Project in Zambia. The signing marks another important milestone in the cooperation between the two parties in the field of power infrastructure construction, laying a solid foundation for improving regional power supply capacity in Zambia.
+MORE